Principal Contractor: Fulton Hogan
Contract Length: Six Months
Engineer: Tonkin & Taylor
The Re:Sort Centre in Rewarewa road was opened on 1st October 2005. GBD is proud to have been involved in all aspects of the drainage and earthworks, including the installation of stormwater and sewer lines, 31 cesspits, 13 manholes complete with a separation chamber. We also performed a lot of tasks around the general site, all of varying natures, including the cartage and spreading soil and metal, undercutting, cutting to grade for roading, compacting and rolling, cutting into mains, all under-kerb drainage, removing surplus cesspits and general backfilling and cleaning up.